Halter AG is one of the leading providers of construction and real estate services in German-speaking Switzerland. To minimize internal efforts, the company decided to centralize all IT services at its headquarters in Zurich.
For the centralized management of its four business locations and numerous construction sites, standardized connections and comprehensive networking were required. Cyberlink addressed this challenge with a highly flexible site networking solution (Corporate Network).

halter Logo

Marc Funcek, Head of IT, and Stefan Koch, responsible for infrastructure and networking, were faced with a challenge: standardizing IT services both at the business locations and on construction sites. The goal was to increase efficiency and enable a stronger focus on core competencies. Until 2014, the numerous construction sites had been connected via simple DSL lines, with Halter implementing networking through VPN connections. “Unfortunately, outages occurred repeatedly, and identifying the root cause was usually difficult,” explains Marc Funcek. It was not uncommon for one to two days to be spent fully diagnosing a problem. As a result, work on construction sites was delayed and tight project schedules could no longer be met. To counter these time- and cost-intensive incidents, Halter AG decided to place its networking in the hands of specialists and turned to Cyberlink.

“Cyberlink was recommended to us by third parties,” says Funcek. High availability, great flexibility, and a strong price-performance ratio were the primary requirements for the new solution. After in-depth discussions and a detailed assessment of needs, the project began with an initial test installation. “We quickly realized that this was exactly the type of service we had been looking for.” In a first step, the four business locations and the first three construction sites were connected and networked. At the headquarters in Zurich, Cyberlink installed a redundantly designed Business Internet connection via fiber (Ethernet) with an availability of 99.97%. The other three locations, as well as major construction sites, were also connected via Ethernet-based fiber, while smaller construction sites were connected using Managed DSL. “From the initial discussions to commissioning, the implementation of this first phase took just four months — that’s extremely fast,” notes Stefan Koch. This was followed by the gradual migration of the remaining construction sites. Within one year, the second phase was also completed.

“Thanks to Cyberlink’s managed service, we were able to reduce our support efforts at external locations by around 80%,” explains Marc Funcek. “The time savings are enormous.” With the site networking solution (Corporate Network) and centralized internet access at the headquarters, Halter AG was also able to centralize its entire telephony system. “This resulted in significant cost savings,” Funcek adds. Cyberlink’s flexibility also receives high praise. For example, a dedicated product was created specifically for connecting construction sites — and within a very short time. As a result, several construction sites without suitable physical connection options are now integrated into the network via 3G/4G routers using mobile connections. This state-of-the-art mindset aligns perfectly with Halter AG’s own approach.

Marc Funcek and Stefan Koch conclude: “We can recommend Cyberlink to anyone looking for a reliable and flexible partner with a modern mindset and stable services.”

Thanks to Cyberlink’s managed service, we were able to reduce our on-site support deployments at remote locations by around 80%. With Cyberlink’s modular service design and flexibility, it’s a clear win.

Marc Funcek | Head ICT, Halter AG

The solution at a glance.

  • Headquarters connected via Ethernet (redundant over 4 fibers with dual building entry).
  • All branch locations connected via Ethernet.
  • Various construction sites connected via DSL, Ethernet, or 3G/4G.
  • All locations interconnected.
  • Internet traffic from all locations routed through a firewall cluster at the headquarters.

Building with insight.

Traditional processes in the construction and real estate industry, involving tenders awarded to total or general contractors, often lead to inefficiencies and suboptimal results. By involving all stakeholders at an early stage, costs can be reduced and better outcomes achieved. With the integrated project delivery model, clients, planners, and contractors work together toward a common goal.

Halter AG.

Around 100 years ago, what is now Halter AG was founded in Zurich. The company, which remains owner-managed to this day, now employs around 200 people at four locations in Zurich, Bern, Basel, and Lucerne. Halter AG is one of the leading providers of construction and real estate services in German-speaking Switzerland. It is structured into three independent business units — Development, Integrated Services, and Real Estate — each operating independently in the market.

halter.ch